CONSTRUCTION UPDATES

WEEK OF MAY 10, 2021

Monday, May 10, 2021

  • R. W. Dunteman Company prepared for the placement of a temporary concrete barrier wall along Lake Cook Road east of the Target and Walmart intersection, removed the existing pavement along Weiland Road north of Lake Cook Road, and prepared for the placement of the curb and gutter on southbound IL-83 south of Lake Cook Road

  • Areatha framed and placed overhang brackets on the Weiland Road Bridge

  • Trine continued to install the proposed storm sewer pipe and structures on eastbound Lake Cook Road west of Lexington Drive

  • Home Towne installed conduit for the traffic signals by Lake Cook Road and Weiland Road and installed the unit duct for street lighting on eastbound Lake Cook Road by the Walmart and Target intersection

  • Trafic Services Inc. placed the temporary striping along Buffalo Grove Road and Weiland Road for the pedestrian crosswalks

  • Industrial Fence Inc. relocated the temporary attenuators along Lake Cook Road from the winter traffic stage to the maintenance of traffic stage

  • Maintence Coating Company relocated the temporary concrete barrier walls along Lake Cook Road east of the Target and Walmart intersection to Hastings Lane

  • AC Iron continued the placement and tying of the rebar at the Weiland Road Bridge deck

Trine_SSRCPInstallationLCR_05102021.jpg

Tuesday, May 11, 2021

  • R.W. Dunteman Company removed and hauled out the concrete median, prepared subgrade, and placed aggregate subgrade by Lake Cook Road and Buffalo Grove Road and removed the existing pavement on south bound Weiland Road north of Lake Cook Road

  • Areatha continued to frame and place the overhang brackets on Weiland Road Bridge

  • Trine installed the proposed storm sewer pipe and structures on east bound Lake Cook Road west of Lexington Drive

  • Home Towne installed conduits on eastbound Lake Cook Road east of Target and installed inserts for the conduit hangers on the Weiland Road Bridge deck

  • AC Iron continued the placement and tying of rebar at the Weiland Road Bridge deck

  • Clausen loosened the existing diaphragms on Buffalo Grove Road Bridge

RWD_SBWeilandEx_05112021_edited.jpg

Wednesday, May 12, 2021

RWD_SBWeilandEx_05122021.jpg
  • R.W. Dunteman Company continued to excavate and prepare for subgrade on southbound Weiland Road north of Lake Cook Road, prepared for the placement of temporary pavement along Lake Cook Road, and framed and graded southbound of IL-83 for the upcoming pavement pour

  • Quality saw cut the existing deck on the west side of Buffalo Grove Road Bridge

  • Trine continued the removal and replacement of the storm sewer pipe and structures along eastbound Lake Cook Road east of the Target and Walmart intersection to Lexington Drive

  • Areatha continued the removal of the existing bridge deck on the west side of Buffalo Grove Road Bridge and continued to frame the Weiland Road Bridge deck for the upcoming deck pour

Thursday, May 13, 2021

Ruizscape_CreekRelocationRipripInstallat
  • R.W. Dunteman Company excavated and prepared the subgrade on southbound Weiland Road north of Lake Cook Road and graded for the concrete pavement and sidewalk on the southwest corner of IL-83 and Lake Cook Road

  • Areatha finished framing diaphragms and set the bridge deck paver for the upcoming deck pour on the Weiland Road Bridge deck

  • Clausen jacked up the existing beams on Buffalo Grove Road Bridge to remove the existing bearings

  • Ruizscape graded and touched up channel bed aggregate and placed topsoil along Buffalo Creek by Weiland Road Bridge

  • Trine removed and replaced the storm sewer pipes and structures along eastbound Lake Cook Road east of Lexington Drive

Friday, May 14, 2021

Areatha_WeilandRdBridgeDeckPour_05142021
  • R.W. Dunteman Company continued to excavate and prepared the subgrade along southbound Weiland Road north of Lake Cook Road and excavated and prepared subgrade on southbound IL-83 north of Lake Cook Road

  • TCP switched the westbound Lake Cook Road traffic from two lanes to one lane from Target and Walmart intersection to Raupp Boulevard

  • Trine saw cut the existing pavement and installed the proposed storm sewer pipe and structures on westbound Lake Cook Road west of Buffalo Grove Road

  • Areatha poured the Weiland Road Bridge deck and covered it with burlap and plastic

  • Ruizscape placed and graded the topsoil along Lake Cook Road by the retaining wall and Buffalo Grove Road Bridge

  • Clausen removed the existing rocker bearings at the south and north abutment of Buffalo Grove Road Bridge