CONSTRUCTION UPDATES

WEEK OF MAY 24, 2021

Monday, May 24, 2021

  • R.W. Dunteman Company poured concrete pavement on southbound Weiland Road for lanes 1 and 2 north of Lake Cook Road and at the southwest corner of IL-83 and Lake Cook Road, removed the existing pavement, sidewalk, and curb and gutter on Buffalo Grove Road, and started removing the existing pavement along eastbound Lake Cook Road by the Target and Walmart intersection

  • Areatha removed paver and finishing bridge and strip back forms from the east abutment of the Weiland Road bridge and sandblasted the bridge deck to prepare the surface for the sidewalk pour

  • Trine continued the installation of the 20” water main along Weiland Road east of Buffalo Grove Road and prepared for the 10” sanitary sewer force main work at the southwest corner of the Buffalo Grove Road bridge

  • Maintenance Coating Co installed and relocated the temporary barrier walls along eastbound Lake Cook Road for the traffic configuration change along Lake Cook Road

  • Home Towne framed light pole foundations and controller foundations at the northeast corner of Weiland Road and IL-83

  • TCP removed and replaced pavement markings and signage along Lake Cook Road to switch traffic into the new configuration

  • Industrial Fence Inc relocated temporary impact attenuators on Lake Cook Road for the traffic configuration change along Lake Cook Road

Trine_20InWMRunWeilandRd_05242021_edited

Tuesday, May 25, 2021            

  • R.W. Dunteman Company poured concrete pavement on southbound Weiland Road for the left and right turn lanes at the Lake Cook Road intersection, continued to remove pavement along eastbound Lake Cook Road east of the Target and Walmart intersection, prepared the subgrade on IL-83, and removed the non-special waste materials from the project site

  • Areatha framed the sleeper slab footings for the Weiland Road bridge approach slab, received delivery of the soldier piles for retaining Wall C

  • Trine continued to install 20” water main along Weiland Road east of Buffalo Grove Road, and completed the relocation of the 10” sanitary sewer force main at the southwest corner of the Buffalo Grove Road Bridge

  • Home Towne framed light pole foundations and the controller foundation on the east side of Weiland Road Bridge

  • Industrial Fence Inc continued to relocate temporary impact attenuators along Lake Cook Road from the recent traffic configuration change

RWD_SBWeilandRdTurnLanePCCPour_05252021.

Wednesday, May 26, 2021      

Antigo_PvtBreakingLCR_05262021.jpg
  • R.W. Dunteman Company continued to remove pavement along eastbound Lake Cook Road between Lexington Drive and the Target and Walmart intersection, prepared the subgrade along IL-83, and completed a proof roll

  • Areatha finished forming and poured the sidewalk on the north side of the Weiland Road bridge deck

  • Trine continued to install and remove storm sewer pipe and structures along Lake Cook Road west of Buffalo Grove Road and hauled out spoils from the completed water main work along Weiland Road

  • Home Towne installed raceways under the Weiland Road bridge deck and installed conduits for traffic signals on southbound IL-83

  • Maintenance Coating Co. continued to relocate and install a new temporary concrete barrier wall along Lake Cook Road for the recent traffic configuration change

  • Industrial Fence Inc Industrial Fence Inc continued to relocate temporary impact attenuators along Lake Cook Road from the recent traffic configuration change

  • Antigo broke concrete pavement along westbound Lake Cook Road from Raupp Boulevard to Weiland Road

Thursday, May 27, 2021

RWD_SBIL83Undercut_05272021.jpg
  • R.W. Dunteman Company removed concrete pavement forms on Weiland Road and completed the undercut and placement of aggregate subgrade on southbound IL-83 north of Lake Cook Road

  • Areatha drilled shafts and installed soldier piles for retaining Wall C and prepared and framed sleeper slab for the Weiland Road bridge approaches

  • Trine continued to install and remove storm sewer pipe and structures along Lake Cook Road west of Buffalo Grove Road

  • Home Towne drilled light pole foundations on Weiland Road between Lake Cook Road and Buffalo Grove Road and installed conduit under the Weiland Road bridge deck

  • AC Iron tied rebar at the Weiland Road Bridge sleeper slabs

Friday, May 28, 2021

Trine_20InWMRunWeilandRd_05252021_edited
  • R.W. Dunteman Company continued to break and remove pavement on Lake Cook Road by Lexington Drive

  • Areatha framed the west sleeper slab on Weiland Road Bridge and prepared for the retaining Wall C work

  • Trine continued to install and remove storm sewer pipe and structures along Lake Cook Road west of Buffalo Grove Road and mobilized equipment for upcoming sanitary sewer work

  • Home Towne drilled light pole foundations on northbound IL-83 and installed conduit under the Weiland Road bridge deck

  • AC Iron tied rebar at the Weiland Road Bridge sleeper slabs