CONSTRUCTION UPDATES
WEEK OF JUNE 14, 2021
Monday, June 14, 2021
-
R.W. Dunteman Company removed existing pavement, prepared the subgrade, and placed aggregate subgrade along eastbound Lake Cook Road east of Lexington Drive, and prepared forms for concrete pavement along the southbound IL-83 left turn lanes and along Buffalo Grove Road
-
Trine removed and replaced storm sewer pipe and structures along westbound Lake Cook Road between Buffalo Grove Road and IL-83 and continued with the installation of the 16” water main along Buffalo Grove Road by St Mary’s Parkway
-
Areatha framed the west approach slab on Weiland Road Bridge and continued installing laggings between the retaining Wall C soldier piles
-
Home Towne framed handholes and the traffic controller base at the northwest corner of Weiland Road and IL-83 intersection

Tuesday, June 15, 2021

-
R.W. Dunteman Company prepared subgrade and placed aggregate subgrade along eastbound Lake Cook Road east of Lexington Drive, removed existing pavement and curb and gutter along westbound Lake Cook Road from Raupp Boulevard to Buffalo Grove Road, and poured concrete pavement along southbound IL-83 and southbound Buffalo Grove Road
-
Trine continued to remove and replace storm sewer pipe and structures along westbound Lake Cook Road between Buffalo Grove Road and IL-83 and continued the installation of the 16” and 8” water main at the Buffalo Grove Road and St Mary’s Parkway intersection
-
Areatha framed the east sleeper slab of Weiland Road Bridge and continued to install laggings between the retaining Wall C soldier piles
-
Home Towne continued to install conduits at the northeast and northwest corners of Weiland Road and IL-83 and framed traffic signal foundations and heavy-duty handholes at the northwest corner of Weiland Road and IL-83
-
AC Iron tied rebar at the west approach slab of Weiland Road Bridge
Wednesday, June 16, 2021

-
R.W. Dunteman Company prepared subgrade and placed aggregate subgrade along eastbound Lake Cook Road from Lexington Drive to Hastings Lane and removed existing pavement and curb and gutter along westbound Lake Cook Road from Raupp Boulevard to Buffalo Grove Road
-
Trine installed new storm sewer structures and pipes on Weiland Road west of IL-83 and continued to install the 8" water main along St Marys Parkway
-
Areatha poured the west approach slab and framed the parapet walls on Weiland Road Bridge, and continued to install lagging between the retaining Wall C soldier piles
-
Home Towne poured traffic signal controller foundations, double handholes, signal post bases, and light pole foundations at the Weiland Road and IL 83 intersection
-
AC Iron tied rebar for Weiland Road Bridge sleeper slab
Thursday, June 17, 2021

-
R.W. Dunteman Company prepared subgrade and placed aggregate subgrade on Weiland Road between Buffalo Grove Road and Weiland Road Bridge
-
Areatha framed the east approach slab on Weiland Road Bridge and continued to install lagging between retaining Wall C soldier piles
-
Trine installed pipe underdrain along eastbound Lake Cook Road from Lexington Drive to Hasting Lane and continued to install the 8” water main along St Marys Parkway
-
Home Towne installed conduits for the Weiland Road and IL-83 traffic signals and conduit for the electric service feed from the ComEd pole to the traffic signal controller
Friday, June 18, 2021

-
R.W. Dunteman Company placed capping stone and prepared forms for concrete pavement west of the Weiland Road Bridge and continued to place capping material and grading for pavement along eastbound Lake Cook Road between the Target and Walmart intersection and Lexington Drive
-
Trine installed pipe underdrain on eastbound Lake Cook Road west of Lexington Drive and continued to install the 8” water main along St Marys Parkway
-
Areatha continued to frame parapets on Weiland Road Bridge and strip the forms off the Weiland Road Bridge deck
-
Home Towne pulled electric cables for street lighting and traffic signals at the Weiland and IL-83 intersection
-
AC Iron tied rebar for the Weiland Road Bridge east approach slab
Saturday, June 19, 2021
-
Areatha completed the last section of the east approach slab of Weiland Road Bridge