WEEK OF OCTOBER 18, 2021
Monday, October 18, 2021
-
R.W. Dunteman Company framed and poured sidewalk along eastbound Lake Cook Road from the Target and Walmart intersection to Hastings Lane, poured concrete median and curb and gutter along northbound Weiland Road north of Lake Cook Road and along Lake Cook Road east of Weiland Road, removed pavement, prepared subgrade, and placed aggregate subgrade in preparation for pavement at St Mary’s Parkway and Weiland Road intersection
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and diaphragms
-
AC Iron prepared the top flange of the girders on the Buffalo Grove Road Bridge and installed stud shear connectors
-
Home Towne framed traffic signal bases at the Lake Cook Road and the Target intersection and excavated and poured handholes at the Lake Cook Road and Weiland Road intersection
-
Quality Saw prepared longitudinal pavement joints along eastbound and westbound Lake Cook Road and placed sealant in joints

Tuesday, October 19, 2021

-
R.W. Dunteman Company prepared and poured concrete pavement for southbound and northbound Buffalo Grove Road left turn lanes at the Weiland Road intersection, placed asphalt leveling binder along northbound and southbound IL-83, continued with concrete median and curb and gutter along northbound Weiland Road and along Lake Cook Road
-
Areatha framed the Buffalo Grove Road Bridge deck and diaphragms and framed and poured the north sleeper slab ab the Buffalo Grove Road Bridge
-
AC Iron tied the reinforcement bar for the north sleeper slab on Buffalo Grove Road and placed the reinforcement bar on the Buffalo Grove Road Bridge deck
-
Home Towne to install unit duct for street lighting along westbound Lake Cook Road by the Target intersection, and install preformed detector loops for the left turn lanes at the Buffalo Grove and Weiland Road intersection
-
Trine set new frames and grates on drainage structures along northbound Weiland Road north of Lake Cook Road
-
Quality Saw prepared longitudinal pavement joints along eastbound and westbound Lake Cook Road and place sealant in joints
Wednesday, October 20, 2021

-
R.W. Dunteman Company poured sidewalk at various location along eastbound and westbound Lake Cook Road, poured concrete median and curb and gutter along Lake Cook Road, removed existing pavement, prepared subgrade and aggregate subgrade for pavement to be poured at the IL-83 and Weiland Road intersection on Lake Cook Road
-
Contractor fine graded aggregate subgrade along northbound Weiland Road in preparation for asphalt pavement
-
Areatha framed the Buffalo Grove Road Bridge deck and diaphragms and installed precast panels for retaining wall B
-
AC Iron tied reinforcement bars for the Buffalo Grove Road Bridge deck and diaphragm
-
Trine adjusted and set frames and grates for drainage structures at various locations along Buffalo Grove Road and on Wieland Road
-
Home Towne drilled light pole foundations along southbound IL-83 south of Lake Cook Road and installed conduit and traffic signal handholes at the IL-83 and Weiland Road intersection
-
Quality Saw prepared longitudinal pavement joints along eastbound and westbound Lake Cook Road and place sealant in joints
Thursday, October 21, 2021

-
R.W. Dunteman Company poured concrete curb and gutter, and sidewalk along northbound Weiland north of Lake Cook Road, poured pavement segments at the IL-83 and Weiland Road intersections on Lake Cook Road, continued with concrete median and curb and gutter along Lake Cook Road, removed existing pavement and prepare subgrade, and aggregate subgrade for pavement to be poured at the Buffalo Grove Road and Lake Cook Road intersection
-
Areatha framed the Buffalo Grove Road Bridge deck and diaphragms and installed precast panels for retaining wall B
-
AC Iron tied reinforcement bars for the Buffalo Grove Road Bridge deck and diaphragm
-
Home Towne drilled light pole foundations along southbound Weiland Road south of Lake Cook Road and along westbound Lake Cook Road west of Buffalo Grove Road, poured light pole foundations and handholes along northbound IL-83, Weiland Road, and westbound Lake Cook Road
-
Trine placed new frame on drainage structure by the Lake Cook Road and Raupp intersection and adjusted various manholes along Weiland Road
Friday, October 22, 2021

-
R.W. Dunteman Company poured sidewalk along eastbound Lake Cook Road between McDonalds and Walmart and on westbound Lake Cook Road between the Binny's entrance and Target, poured concrete median and curb and gutter along Lake Cook Road and Buffalo Grove Road south of Lake Cook Road and poured pavement segments along westbound Lake Cook Road at Raupp Boulevard and the eastbound left turn lane at Buffalo Grove Road intersection
-
Areatha framed the Buffalo Grove Road Bridge deck and diaphragms and installed the precast noise abatement wall panels on the south side of Lake Cook Road
-
Trine set frames on drainage structures along southbound Buffalo Grove Road south of Lake Cook Road
-
AC Iron tied reinforcement bars for the Buffalo Grove Road Bridge deck and diaphragm
-
Home Towne drilled and poured light pole foundations along westbound Lake Cook Road by Buffalo Grove Road
Saturday, October 23, 2021

-
R.W. Dunteman Company prepared for asphalt surface placement on northbound IL-83 and Lexington Drive
-
Areatha placed bidwell on Buffalo Grove Road Bridge deck
-
Home Towne installed unit duct for street lighting along westbound Lake Cook Road and framed handholes for traffic signals at Lake Cook Road and Weiland Road intersection