CONSTRUCTION UPDATES
WEEK OF NOVEMBER 2, 2020
Monday, November 2, 2020
-
R.W. Dunteman Company prepared aggregate subgrade, continued to place forms for the left turn lane along eastbound Lake Cook Road between Raupp Boulevard and Buffalo Grove Road, and installed the aggregate subgrade along eastbound Lake Cook Road between Weiland Road and the Target and Walmart entrances
-
Trine removed and installed storm sewer pipes and structures along Lake Cook Road by the Weiland Road intersection
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and installed laggings and a geocomposite wall drain on retaining wall E
-
Home Towne started the installation of street light foundations along westbound Lake Cook Road between Hastings Lane and Lexington Drive and adjusted signal heads at the Lake Cook Road and Lexington Drive intersection
-
Traffic Services Inc switched traffic into Stage 4C on Lexington Drive

Tuesday, November 3, 2020
-
R.W. Dunteman Company prepared subgrade between Buffalo Grove Road and Walmart for the upcoming pavement pours, placed concrete pavement for the left turn lane along eastbound Lake Cook Road from Raupp Boulevard to Buffalo Grove Road, poured another segment of lane 1 and 2 along eastbound Lake Cook Road near Buffalo Grove Road, and continued to prepare aggregate subgrade for the upcoming pavement pour at Lexington Drive
-
Trine continued to remove and install storm sewer pipes and structures along Lake Cook Road by Buffalo Grove Road and Weiland Road
-
Areatha continued to frame the Buffalo Grove Road Bridge and diaphragms
-
Home Towne continued to install street light foundations along westbound Lake Cook Road from Hastings Lane to Lexington Drive and installed conduit for traffic signals and street lighting at various locations

Wednesday, November 4, 2020

-
R.W. Dunteman Company poured pavement along eastbound Lake Cook Road between Buffalo Grove Road and Weiland Road, prepared for the placement of pavement at Lake Cook Road and Lexington Drive, and removed existing driveways along eastbound Lake Cook Road near Weiland Road in order to reconstruct the entrances
-
Trine continued to remove existing storm sewer pipes and installed the proposed storm sewer pipe and structure along eastbound Lake Cook Road by Buffalo Grove Road
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and diaphragms and installed laggings and a geocomposite wall drain for retaining wall B
-
Home Towne continued to install street light foundations along westbound Lake Cook Road from Hastings Lane to Lexington Drive and installed conduit for traffic signals and street lighting at various locations
-
AC Iron installed stud shear connectors on the soldier piles for retaining wall B
-
Clausen installed steel diaphragms between girders D and E on Buffalo Grove Road Bridge
Thursday, November 5, 2020

-
R.W. Dunteman Company continued to excavate and prepare aggregate subgrade along eastbound Lake Cook Road between Weiland Road and Walmart and completed hand pours for the proposed pavement at various locations along Lake Cook Road
-
Trine continued to install proposed storm sewer structures and pipes along eastbound Lake Cook Road near Buffalo Grove Road
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and diaphragms
-
Home Towne continued to install street light foundations along westbound Lake Cook Road from Hastings Lane to Lexington Drive and installed detector loops along eastbound Lake Cook Road before the pavement pour at Buffalo Grove Road and IL-83
-
Industrial Fence Inc removed the temporary impact attenuators along eastbound Lake Cook Road by the Target and Walmart entrances
Friday, November 6, 2020

-
R.W. Dunteman Company removed pavement and prepared subgrade for the upcoming pavement pours along eastbound Lake Cook Road by the Weiland Road intersection, continued to form lanes 1 and 2 between Weiland Road and Walmart, and placed concrete pavement at the southeast corner of IL-83 and Lake Cook Road and at the northeast corner of the Lexington Drive and Lake Cook Road intersection
-
Trine set new frames and grates on storm sewer structures between Buffalo Grove Road and IL-83 and removed the 16” water main that was in conflict with the northeast wing wall of the Buffalo Grove Road bridge
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and diaphragms
-
Home Towne continued to install light pole foundations along eastbound Lake Cook Roud between Lexington Drive and Target
-
AC Iron installed stud shear connectors on the Buffalo Grove Road Bridge beams
Saturday, November 7, 2020

-
R.W. Dunteman Company removed existing pavement, excavated, and installed aggregate subgrade on the southeast corner of Lake Cook Road and Weiland Road and on the southwest corner of Lake Cook Road and IL-83 and laid out tie bar and dowel bar baskets on lane 3 along eastbound Lake Cook Road between Buffalo Grove Road and Weiland Road
-
Areatha continued to frame the Buffalo Grove Road Bridge deck and installed a downspout for floor drains