WEEK OF NOVEMBER 9, 2020

Monday, November 9, 2020

  • R.W. Dunteman Company paved along eastbound Lake Cook Road lane 3 from Buffalo Grove Road to the Walmart and Target entrances, prepared for various hand pours throughout the job site by setting, forming, and placing dowel bar baskets and removed the existing pavement at the Walmart, Mobil, and Bank of America driveways for the reconstruction of those entrances

  • Trine installed storm sewer pipes and structures at the southwest corner of Buffalo Grove Road and Lake Cook Road, removed the existing sanitary sewer pipe and structure, and installed a proposed  sanitary force main at the northwest corner of IL-83 and Lake Cook Road

  • Areatha continued to frame the Buffalo Grove Road Bridge deck and excavated for the footing at the northeast wing wall

  • Home Towne installed detector loops along eastbound Lake Cook Road by the Weiland Road and IL-83 intersections

  • AC Iron continued to tie rebar at Buffalo Grove Road Bridge deck and diaphragms and installed the remaining stud shear connectors along the Buffalo Grove Road bridge beam

RWD_EBLCRLn3PCC_11092020.jpg

Tuesday, November 10, 2020

  • R.W. Dunteman Company continued to pour pavement for the turn lanes at the Lake Cook Road and Lexington Drive, Lake Cook Road and IL-83, and Lake Cook Road and Buffalo Grove Road intersection and prepared subgrade for driveways along Lake Cook Road from Weiland Road to the Target and Walmart entrances   

  • Trine continued to place flowable fill in abandoned storm sewer pipes and water mains along Lake Cook Road and Buffalo Grove Road and installed proposed storm sewer structures and pipes at the northeast corner of Buffalo Grove Road and Lake Cook Road

  • Areatha continued to frame the Buffalo Grove Road Bridge deck and worked on excavating for the Buffalo Grove Road bridge northeast wing wall

  • Home Towne continued to install conduit for street light and traffic signals along eastbound Lake Cook Road by the Walmart and Mobil entrances

  • AC Iron continued to tie rebar at Buffalo Grove Road Bridge deck and at the north and south abutment diaphragms

Areatha_BGRdBridgeDeckFrame_11102020.jpg

Wednesday, November 11, 2020

Trine WM 11112020.jpg
  • R.W. Dunteman Company continued to pour pavement for lanes 1 and 2 along eastbound Lake Cook Road by the Weiland Road intersection, poured temporary pavement at various locations along Lake Cook Road for the upcoming winter traffic switch, and worked on completing the driveway entrances to the Bank of America, Mobil and Walmart along eastbound Lake Cook Road

  • Trine removed the existing water main and storm sewer system to install the proposed storm sewer pipes and structures at the northeast corner of Lake Cook Road and Buffalo Grove Road and set frames and grates along eastbound Lake Cook Road for the upcoming curb and gutter pour

  • Areatha continued to frame the Buffalo Grove Road Bridge diaphragms and the north abutment wing wall

  • Home Towne continued to install conduit for traffic signals and street lighting by the northeast corner of Lake Cook Road and IL-83 and installed a unit duct for the street lighting along westbound Lake Cook Road

Thursday, November 12, 2020

RWD_EBLCRSleeper_11122020.jpg
  • R.W. Dunteman Company continued to pour temporary pavement on IL-83 north and south of Lake Cook Road, prepared subgrade at the northwest corner of Lake Cook Road and Lexington Drive, and excavated for the sleeper slab placement at the Lake Cook Road and Weiland Road intersection

  • Trine continued to install the proposed storm sewer pipes and structures at the northeast corner of Buffalo Grove Road and Lake Cook Road and set frames and grates along eastbound Lake Cook Road for the upcoming curb and gutter pours

  • Areatha continued to frame the Buffalo Grove Road Bridge diaphragms, poured the remaining portion of the northeast wing wall, and set rails for the deck pavement equipment on Buffalo Grove Road Bridge

  • Home Towne continued to install the unit duct and connected ground cables for light pole foundations along westbound Lake Cook Road

Friday, November 13, 2020

Areatha_BGRdBridgeNEWingWFrame_11132020.
  • R.W. Dunteman continued to pour the pavement and curb and gutter along eastbound Lake Cook Road between IL-83 and the Target and Walmart entrances and poured temporary pavement along various locations along Lake Cook Road for the upcoming traffic switch

  • Trine install a 16" water main through the proposed northeast wing wall of the Buffalo Grove Road Bridge at the southeast corner of Buffalo Grove Road and Lake Cook Road

  • Areatha continued to frame the Buffalo Grove Road Bridge diaphragms and set bidwell rails on beams for the upcoming bridge deck pour

  • Home Towne continued to install the unit duct and connected ground cables for the light pole foundations along westbound Lake Cook Road and continued to drill and place rebar cage for the light pole foundations along westbound Lake Cook Road

  • AC Iron continued to tie rebar at the Buffalo Grove Road Bridge northeast wing wall footing

  • Quality Saw cut and sealed joints on westbound Lake Cook Road between Lexington Drive and Target and on northbound Buffalo Grove Road south of Lake Cook Road

Saturday, November 14, 2020

Areatha_11142020.jpg
  • R.W. Dunteman Company graded and prepared for the temporary pavement along eastbound Lake Cook Road by Buffalo Grove Road and along northbound IL-83 between existing and proposed pavement

  • Areatha continued to set front face forms on the northeast wing wall on Buffalo Grove Road Bridge

  • AC Iron continued to tie rebar for Buffalo Grove Road Bridge northeast wing wall

  • Quality Saw continued to saw cut and seal joints on eastbound Lake Cook Road between IL-83 and Target