CONSTRUCTION UPDATES

WEEK OF April 27, 2020

Monday, April 27, 2020

Trine_SSStructureInstallation_05012020.j
  • R.W. Dunteman Company continues to excavate, haul out dirt, set up crusher at pond area and grade temporary Weiland Road access
     

  • Trine continues to remove existing storm sewer reinforced concrete pipe run and storm sewer structures, install new storm sewer reinforced concrete pipe run and storm sewer structures on northbound Buffalo Grove Road
     

  • Home Towne continues to remove street lighting poles and concrete foundations along Route 83 and Weiland Road
     

  • Areatha to install protective shield jack hammer and remove the deck overlay asphalt at Buffalo Grove Road bridge

Tuesday, April 28, 2020

Areatha_BGBridgeProtectiveShield_0428202
  • R.W. Dunteman Company continues to excavate, haul out dirt, set up crusher at pond area and grade temporary Weiland Road access
     

  • Home Towne continue to remove street lighting poles and cables along Route 83, Lake Cook Road, and Weiland Road
     

  • Trine continues to remove existing storm sewer reinforced concrete pipe run and storm sewer structures, install new storm sewer reinforced concrete pipe run on northbound Buffalo Grove Road
     

  • Areatha continues to install protective shielding and remove the asphalt deck overlay at Buffalo Grove Road bridge
     

  • Traffic Control Protection to install temporary concrete barrier wall on Buffalo Grove Road bridge for closure
     

  • Industrial Fence Inc to install impact attenuator at Buffalo Grove Road bridge
     

  • Ruizscape to install inlet filters on northbound and southbound Route 83 and northbound Buffalo Grove Road, place riprap on storm sewer structure on southeast side of Buffalo Grove Creek

Wednesday, April 29, 2020

  • Trine to deliver storm sewer structures on Buffalo Grove Road, no field work due to rain

Thursday, April 30, 2020

Trine_SSRCPInstallation_04302020.jpg
  • Home Towne continues to remove street lighting poles and concrete foundations along Route 83 and Lake Cook Road
     

  • Trine continue to remove existing storm sewer reinforced concrete pipe run, install new storm sewer reinforced concrete pipe run and storm sewer structures on northbound Buffalo Grove Road
     

  • Areatha to layout saw cut lines on Buffalo Grove Road, bridge deck and sidewalk

Friday, May 1, 2020

Areatha_BGBridgeSWRem_05012020.jpg
  • Home Towne continues to remove existing street lighting poles on northbound and southbound Buffalo Grove Road
     

  • R.W. Dunteman Company continues to excavate and haul out dirt at pond area
     

  • R.W. Dunteman Company removes curb and gutter and top soil behind curb and gutter on southbound Route 83 in preparation for temporary pavement, and pothole patching at Buffalo Grove road from Aptakisic Road to Walgreens
     

  • Trine continues to remove existing storm sewer reinforced concrete pipe run and structures, install new storm sewer reinforced concrete pipe run and structures on northbound Buffalo Grove Road
     

  • Areatha to remove existing handrail along sidewalk on Buffalo Grove Road bridge
     

  • Quality Saw saw cut sidewalk and deck on Buffalo Grove Road bridge

Saturday, May 2, 2020

Dunteman_PondExcavation_05022020.jpg
  • R.W. Dunteman continues to excavate and haul out dirt at pond area