CONSTRUCTION UPDATES

SUBSCRIBE TO THE PROJECT E-NEWSLETTER TO RECEIVE CONSTRUCTION UPDATES DIRECTLY TO YOUR INBOX

WEEK OF SEPTEMBER 21, 2020

Monday September 21, 2020

  • R.W. Dunteman Company installed aggregate subgrade on Lake Cook Road by Lexington Drive and prepared subgrade at the southeast corner of Lake Cook Road and IL-83 and along northbound Buffalo Grove Road north of Lake Cook Road

  • Trine removed and installed the storm sewer pipes and structures along eastbound Lake Cook Road between Buffalo Grove Road and IL-83 and started to mobilize equipment to the southwest corner of Lake Cook Road and Weiland Road                                                                                                              

  • Areatha framed the north abutment footing at Buffalo Grove Road Bridge 

  • Clausen removed supports and cribbing from the existing north abutment at Buffalo Grove Road Bridge 

  • AC Iron tied rebar at Buffalo Grove Road Bridge footing for the north abutment and wing wall

RWD_EBLCRPvtRem_09212020.jpg

Tuesday, September 22, 2020

  • R.W. Dunteman Company removed pavement, sidewalk and prepared subgrade along eastbound Lake Cook Road between Raupp Boulevard and Buffalo Grove Road and installed the aggregate subgrade on Lake Cook Road by the Target entrance

  • Trine removed and installed the storm sewer pipes and structures along eastbound Lake Cook Road between Buffalo Grove Road and Weiland Road

  • Home Towne installed conduit for traffic signals along westbound Lake Cook Road east and west of Lexington Drive

  • Areatha set forms for the facing wall on retaining Wall A

HomeTowne_StreetLightingConduitInstallat

Wednesday, September 23, 2020

Aretha_BG Bridge_09232020.jpg
  • R.W. Dunteman Company installed the aggregate subgrade along IL-83 south of Lake Cook Road and on westbound Lake Cook Road from Target to Hastings Lane and continued with channel excavation by Weiland Road Bridge

  • Home Towne installed conduit for traffic signals along westbound Lake Cook Road west of Lexington Drive

  • Trine removed and installed the storm sewer pipes and structures along eastbound Lake Cook Road between Buffalo Grove Road and Weiland Road

  • Areatha poured footing for the north abutment of Buffalo Grove Road bridge and poured a section of the facing wall for retaining Wall A

Thursday, September 24, 2020

RWD_NBBGRdSubgradeGrading_09242020.jpg
  • R.W. Dunteman Company installed the aggregate subgrade on westbound Lake Cook Road between the Target entrance and Lexington Drive and northbound Buffalo Grove Road north of Lake Cook Road and continued with channel excavation by Weiland Road Bridge 

  • Trine removed and installed the storm sewer pipes and structures along eastbound Lake Cook Road between Buffalo Grove Road and Weiland Road 

  • Areatha removed forms from the south abutment wing wall at Buffalo Grove Road Bridge

Friday, September 25, 2020

Trine_SSRCPInstallation_09252020.jpg
  • R.W. Dunteman Company continued channel excavation by Weiland Road Bridge and graded aggregate subgrade along westbound Lake Cook Road from Hastings Lane to the Target truck entrance and prepared forms for concrete pavement along northbound IL-83 and northbound Buffalo Grove Road. R.W. Dunteman Company prepared subgrade along eastbound Lake Cook Road from Raupp Boulevard to Buffalo Grove Road

  • Trine removed and installed the storm sewer pipes and structures along eastbound Lake Cook Road between IL-83 and Weiland Road 

  • Home Towne installed conduit for traffic signals along westbound Lake Cook Road by the Target entrance and Buffalo Grove Road intersection 

  • Areatha set forms on the north abutment at Buffalo Grove Road Bridge

Saturday, September 26, 2020

RWD_ChannelExcavation_09262020.jpg
  • Areatha set forms on the north abutment at Buffalo Grove Road Bridge

  • R.W. Dunteman Company continued to form and prepare for the concrete pavement pour along northbound IL-83 south of Lake Cook Road, northbound Buffalo Grove Road north of Lake Cook Road, and westbound Lake Cook Road from the Target and Walmart entrance to Lexington Drive