Tuesday, September 8, 2020

  • Trine continued the removal and installation of storm sewer pipe and structures along eastbound Lake Cook Road between Buffalo Grove Road and Raupp Boulevard

Trine_SSStructureInstallation_09112020.j

Wednesday, September 9, 2020

  • R.W. Dunteman Company removed existing pavement along westbound Lake Cook Road from Lexington Drive to the Target and Walmart entrance and placed a new asphalt driveway at the Jewel entrance on IL-83 and temporary pavement along the median. R.W. Dunteman Company repaired various aggregate entrances and driveways throughout the project due to the previous days rain

  • Trine continued the removal and installation of storm sewer pipe and structures along eastbound Lake Cook Road between Buffalo Grove Road and Raupp Boulevard

  • Home Towne covered the detector loop cables in the left turn lane by northbound IL-83 and Jewel entrance intersection

RWD_TempDrivewayIL83_09092020.jpg

Thursday, September 10, 2020

BG South Abut 09102020.jpg
  • R.W. Dunteman Company removed existing pavement along westbound Lake Cook Road from Lexington Drive to the Target and Walmart entrance and completed general site cleanup on the completed pavement along Weiland Road and IL-83

  • Trine continued the removal and installation of storm sewer pipe and structures along eastbound Lake Cook Road between Buffalo Grove Road and Raupp Boulevard and set frames and grates on storm sewer structures along northbound Buffalo Grove Road, northbound IL-83, and north and southbound Weiland Road

  • Areatha continued framing for the southwest wing wall at Buffalo Grove Road Bridge and removed the forms from the south abutment

  • Quality cut existing pavement along IL-83 by the Jewel entrance and on Lake Cook Road by the Target and Walmart entrance

Friday, September 11, 2020

RWD_NBBGRdExcavate_09112020.jpg
  • R.W. Dunteman Company excavated to subgrade along northbound Buffalo Grove Road north of Lake Cook Road and on northbound IL-83 south of Lake Cook Road

  • Trine continued the removal and installation of storm sewer pipe and structures along eastbound Lake Cook Road between Buffalo Grove Road and IL-83

Saturday, September 12, 2020

Trine_RestrictorPlateInstallation_091220
  • Trine installed a restrictor plate in a manhole along westbound Lake Cook Road west of Lexington Drive